Monday - The big closets will have plenty of wood shelves - cabinets - and clothes hanger rods. When they are caulked and sanded they will be painted white.
The weather was cold and windy outside - but it was warm and toasty inside thanks to the SucraCell insulation. Tomorrow has an 80% chance of rain.
The painters continued working on the exterior and interior trim.
All of the tile arrived for the porches - the bathrooms - the kitchen - and the laundry. They will start installing that tomorrow.
Bedroom 1 - the closets have 10 foot ceilings. Bedroom 2 will have the same.
Lulu's side of the master closet.
Harry's side of the master closet.
Lulu's closet shelves.
No comments:
Post a Comment