Tuesday - The rain we expected today did not come. So the tile guys were able to start the porch decks. The brick men said they would be back tomorrow to finish the foundation once the ground dried.
Inside Josh and Gary Wayne were putting up the door profiles. Amber and Kim were grouting the master bathroom.
Amber and Kim grouted the laundry - master closet - and master bathroom.
Josh was building door profiles.
The guest bathroom tile is done but still needs the tan grout. This bathroom has a window in the shower. the window will be covered by plantation shutters.
The porch will be covered with swirly gray porcelain tiles that are 16 inches by 16 inches. they are slip proof and ADA approved.
Josh just installed the closet door profiles. They still have to be caulked and painted.
This is the finished laundry floor with white grout.
Bedroom 3 - entry door and double closet door.
Bedroom 3 - doors open
I have found so many interesting thing in your blog and I really love that. Keep up the good work!
ReplyDeletepaver installation Florida
Here i found nice environment to get new ideas and views and the i have read the comments of this blog and these are really nice and it is glad to comment here.Boynton Beach Pavers
ReplyDeleteyou wish to see some real examples of great paving work, simply drive down through Yorkshire and you can have a good look at them yourself. Commercial Paving Colorado Springs CO
ReplyDelete