Thursday, September 19, 2013

Day 27 - Top Hat Trusses Installed


Before dawn - the crane was lifting the top hat trusses into place.


The Top hat trussess completed the roof line.


the crane lifted trusses into place.


This is the attic - a 60 feet by 20 feet by 10 feet open space. It will have a plywood floor and liquid foam insulation overhead. 


Special Stinger nails and washers are used to fasten down the Titanium plastic sheeting.


Gary Wayne cross braces the top hat trusses.


The front porch


The attic or bonus room.


Gary getting ready to lay out the attic steps.